Infrastructure

Roads

  • Asphalt / Cabro finished roads
  • Access point to each plot
  • Bike tracks
  • Pedestrian walkaways
  • Street lighting
  • Lined drains
  • Bus stops


Security

  • Street level CCTV surveillance cameras
  • Electric fence for industrial park
  • Industrial park police post
  • Security patrols
  • Each plot perimeter fence to constructed by individual developer as per development guidelines


MAINS POWER

  • KPLC 3 phase power
  • 132/33KV substation
  • 11kv underground reticulation to each plot boundary


SOLID WASTE MANAGEMENT

  • Solid waste collection and sorting sites to be provided
  • Each developer to manage individual solid waste as per development guidelines


ICT

  • Underground Fibre Optic reticulation to each plot boundary
  • Smart utility management systems


SOLAR

  • Developers to be encouraged to install rooftop solar panels


FIRE FIGHTING FACILITIES

  • Pressurized Fire hydrant reticulation


WATER DESALINATION

  • Sea water desalination plant to be the primary source of water
  • Boreholes will provide water for Phase 1 construction purposes
  • Portable Water reticulation to each plot boundary
  • Treated waste water to be recycled for irrigation and firefighting


SEWER

  • Centralized sewer treatment plant
  • Sewer reticulation up to each plot boundary
  • Industries to pre-treat the industrial waste to WHO standards before release into the sewer system


CONTROLLED DEVELOPMENT

  • Vipingo will be a controlled development with development guidelines to be followed by all developers